With the chassis prepared, painted and cured, it is time to re-attached all of the components that we had previously built, plus a few new items as well.
The following photos show the new IRS suspension installed, new shocks, hard-brake lines, transmission, drive-shafts, and engine.
You can also now see, in the photo above, the font beam and suspension installed at the other end, with the brake hard-lines being installed.
Having re-assembled all of the chassis components, I have also now been able to test the engine and transmission for the first time… glad to say, they all work well, but cannot fully test as the pedal assembly and cables are not fully installed yet.