Year: 2021
Chassis rebuild
With the chassis prepared, painted and cured, it is time to re-attached all of the components that we had previously built, plus a few new items as well. The following photos show the new IRS suspension installed, new shocks, hard-brake lines, transmission, drive-shafts, and engine. You can also now see,…
Chassis preparation
Body has finally arrived!
Change of power train…
New transmission…
Phase 1 complete…
Anti-roll bar…
Spray painting…
Steering Column…
Chassis rebuild

With the chassis prepared, painted and cured, it is time to re-attached all of the components that we had previously built, plus a few new items as well. The following photos show the new IRS suspension installed, new shocks, hard-brake lines, transmission, drive-shafts, and engine. You can also now see,…